Sewage Pump Station Replacement

wetwell-mounted pump station for web
Murfreesboro pump station 2 portfolio
Murfreesboro pump station portfolio 1

Sewage Pump Station Replacement

Study and design for pump station replacement, Murfreesboro, Tennessee.

The City of Murfreesboro needed to upgrade its pump stations on Northwest Broad Street. CIA performed a study to weigh the cost of pump station rehabilitation versus the cost of pump station replacement. The study resulted in the decision to replace three older sewage pump stations with a single new wet-well-mounted sewage pump station. CIA designed the new pump station, which included replacement of deteriorated structural elements and electrical controls.

The benefits of the new single pump station include:

  • Replacement parts for upgraded equipment are readily available, as opposed to retrofitting obsolete equipment;
  • New station meets new city pump station standards with regard to equipment, access, ownership, controls, confined spaces, and water service
  • Significant and measurable cost savings related to staff operating and maintaining a single pump station versus three pump stations
  • Energy cost savings related to a single electric service and operating one pump versus three

CIA was responsible for survey, design, preparation of plans and specifications, assistance with bidding, and construction administration.